C. Baugruppen |
||||||||||||||
Leitlinie |
Akzeptiert |
Frage |
||||||||||||
Leitlinie C-03 |
08.01.2016 | The effect of the derogation in Article 4 paragraph 2 from the introductory paragraph in the same article is not clear. In the circumstances, how should Article 4 paragraph 2 be applied ? | ||||||||||||
Leitlinie C-04 |
08.01.2016 | What shall be the minimum extent of the assembly "boiler" which shall be subjected to a global conformity assessment procedure in accordance with article 4 paragraph 2(a)? | ||||||||||||
Leitlinie C-05 |
08.01.2016 | Shall the assemblies defined in the derogation in Article 4 paragraph 2 subparagraph 2 (boilers intended for generating warm water at temperatures not higher than 110°C) carry the CE-marking? | ||||||||||||
Leitlinie C-06 |
08.01.2016 | Must a hydrostatic pressure test be carried out on an assembly and should the value laid down in Annex I section 7.4 then be followed? | ||||||||||||
Leitlinie C-07 |
15.03.2016 | Which conditions shall be used in the assessment of an item of pressure equipment referred to in Article 4 (1) without a separate CE-marking in an assembly being subject to the global conformity assessment procedure? | ||||||||||||
Leitlinie C-11 |
15.03.2016 | If an item of pressure equipment complies with national pre-PED Regulations and is placed on the market on, or before, 29 May 2002, is it possible for it to be subsequently included in an assembly which is placed on the market after 29 May 2002? | ||||||||||||
Leitlinie C-12 |
15.03.2016 | Do only the essential requirements given in Article 14 paragraph 6 apply to assessment of the integration of assemblies? | ||||||||||||
Leitlinie C-13 |
08.01.2016 | When several items of pressure equipment are assembled by a manufacturer to constitute a functional whole, and when one or several of those items are excluded from the PED by Article 1 paragraph 2, is the resulting whole considered as an assembly covered by the PED ? | ||||||||||||
Leitlinie C-14 |
13.09.2018 | Article 4, paragraph 2 (last sentence) states that the manually fed assemblies must comply with certain essential requirements. Furthermore Article 2 (6) states that the assemblies shall be assembled by the manufacturer. Assuming that the manufacturer wants to use Module B EU-Type examination – design type in accordance with annex II, table 4, is it then sufficient that the manufacturer of the boiler gets an EU-Type examination – design type certificate or shall it be the installer (plumber), who assembles the protective devices to the boiler on site that must obtain the EU-Type examination – design type certificate? |
||||||||||||
Leitlinie C-15 |
15.03.2016 | How are the categories of permanent joints in an assembly to be determined ? | ||||||||||||
Leitlinie C-16 |
15.03.2016 | In Article 14 paragraph 6 (b) what does the “highest category applicable to the equipment concerned” mean? | ||||||||||||
Leitlinie C-18 |
15.03.2016 | When items of pressure equipment making up an assembly have not been previously subjected to an assessment and are therefore assessed at the same time as the assembly in accordance with the point a) of article 14 paragraph 6, shall they carry the information required in Annex I section 3.3? | ||||||||||||
Leitlinie C-19 |
15.03.2016 | If, during functional testing of an assembly at the user's premises by the manufacturer before placing it on the market, modification of an item of pressure equipment is necessary, shall this modification be carried out in accordance with PED 2014/68/EU? | ||||||||||||
Leitlinie C-20 |
15.03.2016 | How to consider a transportable (TPED) pressure receptacle incorporated in an assembly being placed on the market under PED? | ||||||||||||